OZONE OPERATION AND REDOX LEVELS
•Existing pool, no need to change the water,
. Any organic material like stabilizers will be destroyed by Ozone.
•Operating times adjustable depending on volume.
. Mandatory operating times, at least 8 hours per day.
•Redox values used to set the times:
. Operate system until the redox level reaches 600 mV.
. Add a cup of Chlorine to restore to 750 mV
•System can increase Redox voltage higher if operating longer.
•Govt laws stipulate 1 ppm for Domestic Chlorine systems
. With RestEze this level of Chlorine is only with 0.1ppm
.With no saltwater Chlorination, need 2 cups Chlorine per week.
.If operating on a new pool, the water will be very brown and cloudy will will restore to clean and clear within 24 hours of operation.
.If old pool, water will be cloudy white or a few weeks, then clear.